翻訳と辞書
Words near each other
・ Waimania Teddy
・ Waimanu
・ Waimanu River
・ Waimanu Valley
・ Waimarama
・ Waimarama Taumaunu
・ Waimarino
・ Waimarino (New Zealand electorate)
・ Waimarino County
・ Waimarino Museum
・ Waimarino River
・ Waimaro River
・ Waimata River
・ Waimate
・ Waimate (New Zealand electorate)
Waimate Branch
・ Waimate County
・ Waimate Creek
・ Waimate District
・ Waimate North
・ Waimatuku
・ Waimauku
・ Waimea
・ Waimea (New Zealand electorate)
・ Waimea Bay, Hawaii
・ Waimea by-election, 1854
・ Waimea by-election, 1858
・ Waimea by-election, 1859
・ Waimea Canyon State Park
・ Waimea College


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Waimate Branch : ウィキペディア英語版
Waimate Branch

The Waimate Branch was a branch line railway built in southern Canterbury, New Zealand to link the Main South Line with the town of Waimate, the centre of the surrounding rural area. It opened in 1877 and operated until 1966; for some of this time, it included an extension to Waihao Downs that was known as the Waimate Gorge Branch or Waihao Downs Branch. When the line closed, Waimate received the dubious distinction of being New Zealand's first major town to lose its railway line.〔Geoffrey B. Churchman and Tony Hurst, ''The Railways of New Zealand: A Journey Through History'' (Auckland: HarperCollins, 1991), 185.〕
==Construction==

Located roughly halfway between Timaru and Oamaru, Waimate is the major market and service town for the surrounding district, but when the Main South Line between Christchurch and Dunedin was constructed, it was built some 7 km to the east of the township so that it could follow a direct route along the coastal plain without deviating. Both government and residents agreed that a link from the main line village of Studholme to Waimate was necessary.〔David Leitch and Brian Scott, ''Exploring New Zealand's Ghost Railways'', revised edition (Wellington: Grantham House, 1998 ()), 80.〕 In 1876, tenders were called for the line and the winning offer, George Pratt's of ₤4,831, was accepted on 10 March 1876.〔("Wellington" ), ''North Otago Times'' 23(1220) (March 1876 ): 2.〕 Construction was not difficult and the branch opened on 19 March 1877. The first train was hauled by an A class tank locomotive and had three carriages plus a guard's van.〔Leitch and Scott, ''Exploring New Zealand's Ghost Railways'', 81.〕
Two proposals for an extension were made, of which only one eventuated. The plan which did not eventuate was to link Waimate to either Duntroon or Livingstone. One of the proposals for the Otago Central Railway was to build a line from Oamaru to Naseby, and in 1877 an invitation was extended to the Waimate County Council to partake in a plan to connect Waimate to the Oamaru-Naseby line in either Duntroon or Livingstone and thus establish a through route from Central Otago to Canterbury.〔("Oamaru - Naseby Railway Committee" ), ''North Otago Times'' 26(1626) (July 1877 ): 2.〕 A deputation representing the advocates of the Oamaru-Naseby line made a presentation before the Waimate County Council on 12 July 1877, but the Council did not view the proposal as desirable.〔("Waimate County Council" ), ''North Otago Times'' 26(1632) (July 1877 ): 2.〕 The Oamaru-Naseby proposal itself failed to come to fruition, with Duntroon ultimately served by the Kurow Branch and Livingstone located near the terminus of the Tokarahi Branch.
The other extension proposal was for a line into the hinterland behind Waimate, and this one was successful. Local residents established the Waimate Railway Company in late 1878 to construct an extension from Waimate to the Waihao Valley, and work commenced after W. J. Black's tender for construction of the first section was accepted on 16 April 1882.〔("Timaru" ), ''North Otago Times'' 28(3038) (April 1882 ): 2.〕 The initial 11.27 km were built quickly, with the line opened to Waihao Forks on 2 February 1883. Another 2.05 km of trackage to Waihao Downs followed, and this was opened on 24 April 1883, with a small locomotive depot established at the Waihao Downs station. On 1 April 1885, in accordance with the terms of the 1878 District Railways Act under which the Waimate Gorge Branch had been built, the government agreed to take control of the line.〔 There was local pressure to extend the line further and some formation was constructed in 1914 with the goal of continuing the railway to Waihaorunga. However, World War I brought construction to a halt as resources were diverted elsewhere and work did not resume after the war ended. By 1924, the government had decided that extending rural branch lines was not profitable and thus permanently put an end to any plans to build beyond Waihao Downs.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Waimate Branch」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.